Campina WWTP, Prahova County, Romania

Project Info

  • Completion Date

    Completed: July 2012

  • Category

    Wastewater Treatment

Project description


Within this contract, our team elaborated full technical proposal for Campina municipality (Prahova county, Romania) wastewater treatment plant covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 35% solids content.

The plant was designed for a dry weather maximum daily flowrate of 16.048,0 m3/day serving an equivalent population of 51.250 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal, septic sludge acceptance station), primary treatment (primary clarification), advanced biological treatment (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary sludge gravity thickening, excess sludge mechanical thickening, thickened sludge anaerobic digestion, biogas cogeneration, digested sludge mechanical dewatering and quicklime stabilization, and stabilized sludge storage
  • others: technological air treatment

The following disciplines were covered within the proposal:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Instrumentation, control and automation (SCADA)
  • Roads, platforms and alleys
  • Landscaping
  • HVAC