CL9: Cenei-Checea WWTP, Timis County, Romania

Project Info

  • Completion Date

    Completed: In progress ...

  • Category

    Wastewater Treatment

Project description


Within this contract, our team elaborated full technical proposal and design for Cenei-Checea (Timis county, Romania) wastewater treatment plant covering preliminary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 645,83 m3/day serving an equivalent population of 4.701 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (influent wastewater pumping, screening, grit and grease removal), advanced biological treatment with sludge stabilization in sequencing batch reactors (SBRs), chemical phosphorous removal
  • sludge treatment: excess sludge storage tank, excess sludge mechanical dewatering, and dewatered sludge storage

The following disciplines were covered within the proposal/project:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Instrumentation, control and automation
  • Roads, platforms and alleys
  • Landscaping
  • HVAC