CL9: Cenei-Checea WWTP, Timis County, Romania
Project description
Within this contract, our team elaborated full technical proposal and design for Cenei-Checea (Timis county, Romania) wastewater treatment plant covering preliminary treatment, advanced biological treatment and sludge treatment up to 25% solids content.
The plant was designed for a dry weather maximum daily flowrate of 645,83 m3/day serving an equivalent population of 4.701 PE.
The plant’s treatment scheme comprised:
- wastewater treatment: preliminary treatment (influent wastewater pumping, screening, grit and grease removal), advanced biological treatment with sludge stabilization in sequencing batch reactors (SBRs), chemical phosphorous removal
- sludge treatment: excess sludge storage tank, excess sludge mechanical dewatering, and dewatered sludge storage
The following disciplines were covered within the proposal/project:
- Process
- Hydraulics
- Mechanical
- Structural
- Architectural
- Electrical
- Instrumentation, control and automation
- Roads, platforms and alleys
- Landscaping
- HVAC