Moieciu WWTP, Brasov County, Romania

Project Info

  • Completion Date

    Completed: July 2011

  • Category

    Wastewater Treatment

Project description


Within this contract, our team elaborated the process project for Moieciu city (Brasov county, Romania) wastewater treatment plant covering preliminary treatment, advanced biological treatment and sludge treatment up to 22% solids content.

The plant was designed for a dry weather maximum daily flowrate of 1.126,0 m3/day serving an equivalent population of 5.800 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (influent pumping, screening, grit and grease removal, flow and load equalization), advanced biological treatment with sludge stabilization (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal, membrane biological reactors), chemical phosphorous removal
  • sludge treatment: excess sludge aerobic stabilization, stabilized sludge mechanical dewatering, and dewatered sludge storage

The following disciplines were covered within the project:

  • Process, including process control philosophy
  • Hydraulics
  • Mechanical
  • Instrumentation, control and automation