Targoviste WWTP, Dambovita County, Romania

Project Info

  • Completion Date

    Completed: December 2010

  • Category

    Wastewater Treatment

Project description


Within this contract, our team elaborated full technical proposal for Targoviste Sud (Dambovita county, Romania) wastewater treatment plant covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 38.386 m3/day serving an equivalent population of 125.800 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (wet weather wastewater overflow, screening, grit and grease removal, septic sludge acceptance station), primary treatment (primary clarifications), advanced biological treatment (simultaneous denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary sludge gravity thickening, excess sludge mechanical thickening, thickened sludge screening, thickened sludge anaerobic digestion, biogas cogeneration, digested sludge mechanical dewatering, and dewatered sludge storage

The following disciplines were covered within the proposal:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Instrumentation, control and automation (SCADA)
  • Roads, platforms and alleys
  • Landscaping
  • HVAC