Project description
Within this contract, our team elaborated technical project and design details for Drobeta Turnu-Severin (Mehedenti county, Romania) water treatment plant.
The plant was designed for a maximum hourly flowrate of 2.500,0 m3/h.
The following disciplines were covered within the project:
- Hydraulics
- Mechanical
- Structural
- Architectural
- Electrical
- Roads, platforms and alleys
- Landscaping
- HVAC