Nevsehir WWTP, Turkey

Project Info

  • Completion Date

    Completed August 2007

  • Category

    Wastewater Treatment

Project description


Within this contract, our team verify the process design for Nevsehir (Turkey) wastewater treatment plant covering preliminary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 15.744 m3/day serving an equivalent population of 136.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, inlet pumping station, grit and grease removal), primary treatment (primary clarification), advanced biological treatment with sludge stabilization (simultaneous denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal, disinfection
  • sludge treatment: excess sludge mechanical thickening, dewatering, and dewatered sludge storage.

The following disciplines were covered in the contract:

  • Process
  • Mechanical