Philip Morris WWTP

Project description


Within this contract, our team elaborated the process project for Philip Morris (Ilfov county, Romania) wastewater treatment plant covering advanced biological treatment and sludge treatment.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, flow and load equalization, screened wastewater pumping), advanced biological treatment with sludge stabilization (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal)
  • sludge treatment: stabilized sludge bag dewatering, and dewatered sludge storage

The following disciplines were covered in the project:

  • Process
  • Hydraulics
  • Mechanical
  • Instrumentation, control and automation

Davidesti leachate treatment plant, Arges County, Romania

Project description


Within this contract, our team elaborated the technical project and detailed design for Davidesti (Arges county, Romania) lecheate treatment plant covering preliminary treatment, biological treatment and sludge treatment up to 12% solids content.

The plant was designed for a maximum daily flowrate of 50,0 m3/day and included the following treatment:

  • wastewater treatment: preliminary treatment (screening), flow and load equalization, biological treatment with sludge stabilization (alternating denitrification for biological nitrogen removal, phosphorus biological removal), efluent filtration and discharge into the receiving water;
  • sludge treatment: stabilized sludge bed dewatering, and dewatered sludge storage

The following disciplines were covered within the project:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Instrumentation, control and automation
  • Roads, platforms and alleys
  • Landscaping
  • HVAC

Selimpasa WWTP, Turkey

Project description


Within this contract, our team verify the process design for Selimpasa (Turkey) wastewater treatment plant covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 70.000 m3/day serving an equivalent population of 300.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal), primary treatment (primary clarification), advanced biological treatment (simultaneous denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary sludge gravity thickening, excess sludge mechanical thickening, thickened sludge aerobic digestion, digested sludge mechanical dewatering, and dewatered sludge storage.

The following disciplines were covered within the contract:

  • Process
  • Mechanical

Atakoy WWTP, Turkey

Project description


Within this contract, our team verify the process design for Atakoy (Istanbul, Turkey) wastewater treatment plant covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 400.000 m3/day serving an equivalent population of 1.600.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal), primary treatment (primary clarification), advanced biological treatment (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary sludge gravity thickening, excess sludge mechanical thickening, thickened sludge anaerobic digestion, biogas cogeneration, digested sludge mechanical dewatering, and dewatered sludge storage.

The following disciplines were covered in the contract:

  • Process
  • Mechanical

Tuzla WWTP, Turkey

Project description


Within this contract, our team verify the process design for Tuzla (Istanbul, Turkey) wastewater treatment plant covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 100.000 m3/day serving an equivalent population of 500.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal), primary treatment (primary clarification), advanced biological treatment (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary sludge gravity thickening, excess sludge mechanical thickening, thickened sludge anaerobic digestion, biogas cogeneration, digested sludge mechanical dewatering, and dewatered sludge storage.

The following disciplines were covered in the contract:

  • Process
  • Mechanical

Carei WWTP, Satu Mare County, Romania

Project description


Within this contract, our team elaborated the pre-feasibility study for Carei city (Satu Mare county, Romania) wastewater treatment plant modernization and refurbishment covering preliminary treatment, primary treatment, advanced biological treatment and sludge treatment up to 6% solids content.

The plant was designed for a dry weather maximum daily flowrate of 14.688 m3/day serving an equivalent population of 31.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal), primary treatment (primary clarification), advanced biological treatment with sludge stabilization (pre-denitrification for biological nitrogen removal, enhanced phosphorus biological removal), chemical phosphorous removal
  • sludge treatment: primary and excess sludge aerobic digestion, biogas cogeneration, digested sludge bed dewatering, and dewatered sludge storage.

The following disciplines were covered within the project:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Instrumentation, control and automation (SCADA)
  • Roads, platforms and alleys
  • Landscaping
  • HVAC

Predeal WWTP, Prahova County, Romania

Project description


Within this contract, our team elaborated the feasibility study, technical project and detailed design for Predeal (Brasov county, Romania) wastewater treatment plant covering preliminary treatment, biological treatment and sludge treatment up to 25% solids content.

The plant was designed for a dry weather maximum daily flowrate of 3.000 m3/day serving an equivalent population of 20.000 PE.

The plant’s treatment scheme comprised:

  • wastewater treatment: preliminary treatment (screening, grit and grease removal, degritted wastewater pumping), biological treatment (rotating biological contactors for biological nitrogen removal, phosphorus biological removal);
  • sludge treatment: excess sludge aerobic stabilization using rotating biological contactors, stabilized sludge bed dewatering, and dewatered sludge storage

The following disciplines were covered within the project:

  • Process
  • Hydraulics
  • Mechanical
  • Structural
  • Architectural
  • Electrical
  • Automation and SCADA
  • Roads, platforms and alleys
  • Landscaping
  • HVAC